Prefeasibility Assessment of Crude Pipeline Reuse for CO2 and H2
![Prefeasibility Assessment of Crude Pipeline Reuse for CO2 and H2](https://cdn.prod.website-files.com/63e3b74820155d49e193aa74/64a6956ce08356c477047290_presentation-spse-116.jpeg)
Photo by SPSE
Project description
Carbon Limits together with Aker Solutions carried out for the account of SPSE a pre-feasibility study to investigate the potential to reuse some of their pipelines for transport of other fluids (including CO2 / H2). The study included high-level assessments of safety, pipeline integrity, material compatibility, pipeline design, flow assurance, economics, business opportunities and local regulations.
Clients
![](https://cdn.prod.website-files.com/63e3b74820155d49e193aa74/64992bb5658d93fab8ed470c_logo-spse.png)
Partners
![](https://cdn.prod.website-files.com/63e3b74820155d49e193aa74/64992bb5658d93fab8ed4714_Aker_Solutions.svg.png)